54 MW Solar + 180 MW BESS | Project ready to build
Project for the construction of a 54MW photovoltaic solar power plant with 180MW battery storage.
This project provides for the construction and operation of a solar power plant (SPP) based on photovoltaic (solar) panels in the Ivano-Frankivsk region with a total capacity of 54 MW and battery storage with a capacity of 180 MW. This Project can be implemented and put into operation in 2025. Currently, the site is partially documentarily ready for construction: land lease agreement for 30 years, urban planning conditions and restrictions for project design, urban planning calculation with technical and economic indicators, working construction project of the solar power plant (needs updating for new equipment), agreement for non-standard connection to the power grid with the regional power company and technical conditions for connection to the general grid (requires re-conclusion), calculation of the non-standard connection (requires recalculation), expert report on the review of design documentation based on the working project, permit for construction work.
Electrical capacity, kW | 54 000.00 |
Annual electricity production, thousand kWh | 61,506.00 |
Electricity consumption for own needs (including losses during transportation, conversion, and transformation), thousand kWh |
1,356.38 |
Annual electricity output, thousand kWh | 60,149.62 |
Number of hours of peak power usage, hrs/year (SolarGis) | 1139 |